Smurfit-Stone

Six CityPlace Drive,
Creve Coeur, MO 63141

This project involved (6) full floors of fact-paced tenant finish buildout. Since this project was being constructed concurrent to the City Place 6 itself, Kaemmerlen provided careful attentiveness to sequencing. This tenant finish was brought on line simultaneously to the shell structure-a goal met! Additionally, the tenant had a full half-floor of its space dedicated to a data center, with dedicated HVAC equipment and generator.